Several Facts about Qinghai-Tibet Railway
The Qinghai–Tibet Railway is the highest railway in the world and one of the great engineering projects of our time. These facts show why.
The First Railway to Tibet
The Qinghai–Tibet Railway was the first railway to link Lhasa with the rest of China’s rail network. Before it opened in 2006, there was no railway at all in Tibet, a region of about 1.2 million km² that could only be reached by road or by air.
Key Facts & World Records
| Total length | 1,956 km (Xining to Lhasa) |
| Highest point | Tanggula Pass, 5,072 m |
| Highest station | Tanggula Station, 5,068 m |
| Track above 4,000 m | about 960 km |
| Track on permafrost | about 550 km |
| Bridges | about 675 |
| Highest tunnel | Fenghuoshan Tunnel, about 4,900 m |
| Top speed | about 100 km/h on permafrost, 120 km/h elsewhere |
| Xining–Golmud section | opened in 1984 |
| Golmud–Lhasa section | built 2001–2006, opened 1 July 2006 |
World Records Held
World’s Highest Railway
The line crosses the Tanggula Pass at 5,072 m, and about 960 km of track lies above 4,000 m.
World’s Highest Station
Tanggula Station, at 5,068 m, is higher than any peak in the Alps.
Longest Permafrost Track
About 550 km of track is built on permanently frozen ground, a huge engineering challenge.
Highest Railway Tunnel
The Fenghuoshan Tunnel, at about 4,900 m, is the highest railway tunnel in the world.
Special Features
The trains on the Qinghai–Tibet Railway are built for high altitude:
- oxygen is added to the air in every carriage on the high section
- each berth has its own oxygen outlet for personal use
- windows have a coating that blocks much of the strong UV light
- heating and anti-freeze systems protect the train in temperatures far below zero
- the track and trains are designed to run safely on frozen ground
Engineering achievement: to stop the permafrost from melting under the track, engineers used clever solutions such as heat pipes in the ground, layers of crushed rock that let cold air circulate, and long bridges that carry the line over the most fragile ground.

We answer within 12 hours, Monday to Saturday.









































































