Tibet train crossing a long viaduct on the plateau
Tibet travel guide

Why did China build Railway to Tibet?

Why was the Qinghai–Tibet Railway built? The main reason was to make transport to and from the Tibetan plateau faster, cheaper and more reliable, and to support the region’s development. A Chinese saying puts it simply: “If you want to get rich, first build a road.”

The Problem Before 2006

Before 2006, most people could only travel to and from Tibet by road, which took several days and could be cut by snow or landslides. There were flights, but for many people a ticket was too expensive. Goods also had to come by truck, which made everything in Tibet more expensive.

Tibet train crossing the Lhasa River railway bridge

Before the Railway

  • by road: several days each way
  • flights: expensive for many people
  • limited freight
  • roads often cut by snow or landslides
Red train waiting at a Tibet railway platform

After the Railway (2006)

  • Xining to Lhasa in about a day
  • a cheaper way to travel for many people
  • far more freight capacity
  • a reliable service all year round

Four Routes Were Considered

Four possible routes to Tibet were studied. After long research, engineers chose the route from Qinghai:

  • Qinghai–Tibet (chosen): the most practical route, avoiding the worst gorges, deserts and swamps, though it had to solve the problem of building on permafrost.
  • Sichuan–Tibet: very deep gorges and earthquake zones made it extremely difficult at the time. A new Sichuan–Tibet railway is now being built.
  • Yunnan–Tibet: a very long route through high mountains.
  • Xinjiang–Tibet: a route across huge deserts and remote land with no roads or towns.

Construction Timeline

Year What happened
1950s First studies of a railway to Tibet
1958–1984 Surveys and early work; the Xining–Golmud section is built and opens in 1984
2001 On 29 June, work starts on the high Golmud–Lhasa section
2006 On 1 July, the Qinghai–Tibet Railway opens to passengers and freight

It took about half a century from the first plans to the first train into Lhasa, and the result is one of the greatest railway projects of modern times.

We answer within 12 hours, Monday to Saturday.

Tibet Travel Inquiry
Where you start, and when
Tell us about you